buildingwithwisdom wordpress.com

Building with Wisdom Our Wisdom Majestic Knockdown Rebuild

Our Wisdom Majestic Knockdown Rebuild by tnd

OVERVIEW

The site buildingwithwisdom.wordpress.com presently has a traffic classification of zero (the smaller the more users). We have analyzed twenty pages within the web site buildingwithwisdom.wordpress.com and found one hundred and twenty-four websites referencing buildingwithwisdom.wordpress.com. We have unearthed one mass network sites acquired by this website.
Pages Parsed
20
Links to this site
124
Social Links
1

BUILDINGWITHWISDOM.WORDPRESS.COM TRAFFIC

The site buildingwithwisdom.wordpress.com is seeing alternating amounts of traffic all through the year.
Traffic for buildingwithwisdom.wordpress.com

Date Range

1 week
1 month
3 months
This Year
Last Year
All time
Traffic ranking (by month) for buildingwithwisdom.wordpress.com

Date Range

All time
This Year
Last Year
Traffic ranking by day of the week for buildingwithwisdom.wordpress.com

Date Range

All time
This Year
Last Year
Last Month

LINKS TO WEBSITE

Our House in Voyager Point

Tuesday, 19 May 2015. The last one to arrive home. Sunday, 29 March 2015. Fence is gone and driveway is ready. After the meeting the SS told us that he was able to accommodate all fixes and pending things in the next two weeks, so we can have the house ready before Easter. We were a little bit sceptic about the date, but after one week, it seems we may be able to get all things done. Yesterday, we went a.

Building Our Washington Home With Wisdom This is the way we build a house.

Building Our Washington Home With Wisdom. In Building the Washington 29. Grew well based on our skill levels. We also knew which nurseries we liked and would use.

Our Home - the Majestic 40

Our Home - the Majestic 40. Welcome to our journey building our new home. Sunday, 1 September 2013. Well not a lot has happened since my last post. The pool people were advised mid June that they could come back and do the next stage of the pool - the waterline tiles. That only got finished by mid August. The tiler was pretty lazy and left all of his rubbish on site. Saturday, 22 June 2013. Mainly rain has held us up, a big downpour means we hav.

Our Wisdom Trinity 33

Sunday, 21 September 2014. The PCI is done and dusted so now the wait for the Interim Occupation Certificate has begun. Repaint to the repaired ceiling at the top of the stairs. Completion is required to the drainage pipe outlet at the rear balcony to bedroom 1.

Le Voyage du Château de la Milburn

Le Voyage du Château de la Milburn. Our journey of building a Wisdom Homes Majestic 35 in Sydney, New South Wales. Thursday, 2 April 2015. Plus it was onto planning an engagement party and a wedding - eek! We did have our.

Majestic 40 at Gardeners Ridge building a Wisdom Majestic in North Kellyville

Building a Wisdom Majestic in North Kellyville. Lower roof complete except for the eaves. Electrical rough in and cavity door frames put in. Jetmaster XLR Plus housing and horizontal side venting. Lined up for this week are the lower eaves being fitted, insulation fitted and the gyprock booked in from Friday. Roll on September the 7.

Building a Majestic 45

Sunday, 1 February 2015. Moving is such an exhausting process. Friday, 16 January 2015.

WHAT DOES BUILDINGWITHWISDOM.WORDPRESS.COM LOOK LIKE?

Desktop Screenshot of buildingwithwisdom.wordpress.com Mobile Screenshot of buildingwithwisdom.wordpress.com Tablet Screenshot of buildingwithwisdom.wordpress.com

BUILDINGWITHWISDOM.WORDPRESS.COM SERVER

We found that the main root page on buildingwithwisdom.wordpress.com took one thousand one hundred and sixty-eight milliseconds to download. I detected a SSL certificate, so we consider this site secure.
Load time
1.168 sec
SSL
SECURE
IP
192.0.78.13

BROWSER IMAGE

SERVER SOFTWARE

We discovered that buildingwithwisdom.wordpress.com is weilding the nginx os.

HTML TITLE

Building with Wisdom Our Wisdom Majestic Knockdown Rebuild

DESCRIPTION

Our Wisdom Majestic Knockdown Rebuild by tnd

PARSED CONTENT

The site had the following in the homepage, "The brickies are doing a good job so far and the bricks are mostly level with even mortar joints." I noticed that the web site stated " Were liking the colour especially offset with the dark window frames." They also stated " Spoke to one of the friendly bricklayers and he told us the bricking will be finished in three weeks! Unfortunately, a day later, the storms came and put a kybosh on further bricking for the time being. Plumbing, meter box and bricks arrive."

ANALYZE MORE BUSINESSES

Our First Build - Allworth Langford Oran Park

Wednesday, 3 April 2013. Too good to be true. Well I have contacted my ISP to find out what is going one, speed through the day varies from 25Mbps to 80 Mbps. I have asked if this is normal and was told to perform some tests throughout the day for the next day or so and report back. Dam you internet pixies! Monday, 25 March 2013. We have WARP SPEED! Well over the last few days the internet pixies have been working hard and this is my connection this morning.

Our First Home

Thursday, 20 December 2012. Wednesday, 12 December 2012. Landscaping - End of Day 1. Some pics after Day 1 of the landscaping. Some pics around the house before the landscaping. Sunday, 8 July 2012. More steps towards the finish line. Saturday, 30 June 2012. Thursday, 28 June 2012. The builder advised that the PCI date will be 13th July.

Our New HouseMoorebank NSW

Thursday, 23 May 2013. Saturday, 4 May 2013. Saturday, 6 April 2013. Thursday, 28 March 2013. Sunday, 24 March 2013. Saturday, 16 March 2013. Saturday, 9 March 2013. Building our dream home in beautiful Brissy. Georges Fair - The Dream. Mathews Build with Kurmond Homes.