Date Range
Date Range
Date Range
ARCH1392 - Digital Collaboration Studio 2009. Wednesday, July 8, 2009. Exhibition - Array of Screens. The exhibition of the Final Fabrications, featuring a screen for each of the teams and a 7th screen to cover the course as a whole looked simple but effective in the Red Centre foyer. The array of screens look great, esp at night with them glowing out across Science Square. This shows we should have digital displays in there all the time. Wednesday, June 24, 2009.
The World Cultural Center and the surrounding buildings. Perspective view of the building from a far. The environment of the entire map.
Tuesday, November 6, 2012. Final Project submission 4 2012. DESIGN STUDIO 4 PROJECT 3B. Design studio 4 project 3a. Arch 1202 Design studio project 2. Sunday, August 19, 2012. Design Studio 4 project 2 draft. Monday, June 20, 2011. Final Project submission 4 2012.
Thursday, October 30, 2008. The buried interpretation, the silkeborg museum. Ugh, the videos and 3d model didnt show up. Hmmm, before i mentioned about the changes i wanted to undertake for my interpretation. Sunday, October 19, 2008. Tuesday, October 14, 2008.
UNSW - ARCH COMP - ARCH 1390 - DIGITAL REPRESENTATION STUDIO - 2008. Wednesday, October 29, 2008. What Have I Done! Utzons original design for the Silkeborg museum is an instant masterpiece, however the impracticalities of an underground museum of that scale with a high water-table in the area has forced a redesign. To allow light into the lower level, a path of strengthened frosted-glass meanders through the upper level of the building. Additionally, to keep part of Utzons.
Saturday, March 13, 2010. Saturday, March 6, 2010. Born on the 2nd of February 2010. A Great Piece of Architecture.