Date Range
Date Range
Date Range
Thursday, January 22, 2015. New Sailing on Elbow Grease episode is being edited. but till then I can say that the boat does not look like a half eaten fish anymore, but actually resembles a boat. Aft panels are on, now time to sand and then turn the boat over. Tuesday, January 13, 2015. Monday, January 12, 2015.
Friday, September 26, 2014. Thursday, April 24, 2014. Punch a hole in a boat. The fittings have been removed. Now for the frightening but fun part. Patch Removed - Wow that is a big hole. Hole cleaned up and patch made with a step joint. Patch epoxied to hull and sanded smooth. Seams tape with Fiber Glass tape and epoxy.
Sistema de información de Sailing Control. Para acceder a la plataforma es necesario identificarte. Has olvidado tu clave? .
Sailing in light air off Port Sanilac. The rub rails and toe rails on Malinche were worn nearly through due to poor anti chafing technique and years of mooring in an unprotected road. Damaged rails have been removed. The boat is ready to accept new wood. The new rail and pad are ready for installation. Installed and ready for the finsh. The pad hides the scarf joint. The view from the ground.