09004535cd wordpress.com

09004535cd Just another WordPress.com site

Just another WordPress.com site

OVERVIEW

The site 09004535cd.wordpress.com presently has a traffic classification of zero (the smaller the more users). We have analyzed nineteen pages within the web site 09004535cd.wordpress.com and found three websites referencing 09004535cd.wordpress.com.
Pages Parsed
19
Links to this site
3

09004535CD.WORDPRESS.COM TRAFFIC

The site 09004535cd.wordpress.com is seeing alternating amounts of traffic all through the year.
Traffic for 09004535cd.wordpress.com

Date Range

1 week
1 month
3 months
This Year
Last Year
All time
Traffic ranking (by month) for 09004535cd.wordpress.com

Date Range

All time
This Year
Last Year
Traffic ranking by day of the week for 09004535cd.wordpress.com

Date Range

All time
This Year
Last Year
Last Month

LINKS TO WEBSITE

WHAT DOES 09004535CD.WORDPRESS.COM LOOK LIKE?

Desktop Screenshot of 09004535cd.wordpress.com Mobile Screenshot of 09004535cd.wordpress.com Tablet Screenshot of 09004535cd.wordpress.com

09004535CD.WORDPRESS.COM SERVER

We found that the main root page on 09004535cd.wordpress.com took seven hundred and thirty-four milliseconds to download. I detected a SSL certificate, so we consider this site secure.
Load time
0.734 sec
SSL
SECURE
IP
192.0.78.13

BROWSER IMAGE

SERVER SOFTWARE

We discovered that 09004535cd.wordpress.com is weilding the nginx os.

HTML TITLE

09004535cd Just another WordPress.com site

DESCRIPTION

Just another WordPress.com site

PARSED CONTENT

The site had the following in the homepage, "When I was painting I had to keep the different colored parts in different areas of the shed to avoid over spray." I noticed that the web site stated " The most difficult part to secure for paint was the tank as I had nowhere to clamp it." They also stated " When I gave the final coat to each part I put it in front of an infra red heater to dry."

ANALYZE MORE BUSINESSES

09004787ef Just another WordPress.com site

The bike is now completed, It has been an experience and a half! I am really happy how it turned out, if I was to change anything about it, it would be the handle bars! I would not have them as long and I would have them out further. If I was going to add anything else in, I would add in foot rests.

09005134mb Just another WordPress.com site

Handlebars and attaching them to the frame. As i had already used a set of goalposts as the back for my seat i decided it might be a good idea to try and incorporate a set of goalposts into my handlebars as this would complete the rugby pitch with two sets of goals and rugby field. How would i incorporate goalposts into handlebars though? Here is a completed photo of the goalposts.

09005712tf Just another WordPress.com site

I used different shades of Metallic sprays throughout my project, Separating where necessary. Methods of separating included Stencils or Masking Tape. Problem with tape was that it removed paint after It was removed.

09006691nc Just another WordPress.com site

Fillers, paints and finishes. Fillers, paints and finishes. I am starting to see some things coming together on the bike for the first time and I really feel I will get it done. I have removed the engine for spraying. I had to insert a angle .

Inspiration Just another WordPress.com site

I finally got the frame welded together. I used arc, mig and tig welding. I found it very difficult to mark out the round bar and to get it square. I sometimes wished i had chosen the box. However I am happy now that i didnt as i think the round looks very well. i will take these new found skills with me into my future Teaching jobs.